Hrsg/Egb/ Waste Heat Recovery Boiler Exhaust Gas Boiler Steam Boiler for Chemical Industry/ Insustrial Use/Power Plant /Electricity Generation

Product Details
Customization: Available
Function: Steam Boilers
Fuel: Waste Heat
Gold Member Since 2016

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, ISO 14001
Export Year
2008-05-01
Find Similar Products

Basic Info.

Model NO.
Q110/900-35-3.82/450
Structure
Water Tube
Media
Steam and Water
Water Circulation
Natural Circulation
Drum Placement
Vertical Boiler
Pressure
Medium Pressure
Manufacturing Level
A
Burning Style
Waste Heat
Usage
Power Station
Packing:as Required or by Standard
Standard:GB/CE/SGS/ASME
Origin:China
Production Capacity:500 Sets Per Year
Transport Package
Exported Stanard, or According to Requirements
Specification
A level boiler
Trademark
hua yuan
Origin
Origin: China
HS Code
8402190000
Production Capacity
1000 Sets Per Year

Product Description

MAIN PARAMETERS OF THE HRSG/EGB/WASTE HEAT RECOVERY BOILER AS FOLLOWS
Boiler type: Q110/900-35-3.82/450
Drawing No. FR351
Flue gas flow 110,000. Nm3/h
Inlet Flue gas temperature 900 ºC
 Rated boiler evaporation 35 t/h
Stem pressure 3.82 MPa
Superheated Steam temperature ~450 ºC
Feedwater temperature 90(deaeration soft water) ºC
 
HEATING SURFACE AREA
Superheater heating surface area 185 m2
Boiler proper heating surface area 1710 m2
Economizer heating surface area 830 m2
Air preheater heating surface area 945 m2
 
HYDRAULIC TEST
Superheater 5.15 Mpa
Boiler proper 5.15 Mpa
economizer 5.53 Mpa
 




FEATURES OF THE HRSG/EGB/WASTE HEAT RECOVERY BOILER  FOR CHEMICAL INDUSTRY

1.The steam shall be produced by the waste heat of production process, resulting in energy saving and increasing benefit.

2.The waste heat recovery boiler shall feature the following advantages:Compact structure, no pollution, small system resistance, easy operation, and full waste heat recovery.

3.The design of the waste heat recovery boiler shall be in accordance with user's process parameter.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier